Questions? +1 (202) 335-3939 Login
Trusted News Since 1995
A service for global professionals · Saturday, April 26, 2025 · 807,031,717 Articles · 3+ Million Readers

24/7 Fulll closure of Kolo Road at Kūhiō Highway beginning Monday, May 5

Posted on Apr 25, 2025 in Highways News, Main, News

LĪHUʻE, Hawaiʻi – The Hawaiʻi Department of Transportation (HDOT) is notifying the public of the full closure of the intersection of Kolo Road and Kūhiō Highway 24-hours a day, seven days a week beginning on Monday, May 5 for eight weeks.

 

During the closure Kilauea can be accessed through Pili Road and Hoʻokuʻi Road. A temporary turn pocket will be installed at these intersections, for safety and to keep traffic flowing.

 

The closure is necessary for work on the roundabout, sidewalk and for road construction. Crews will be pouring concrete for the apron of the roundabout and the sidewalk. Fine grading and paving will be done at the intersection of Kūhiō Highway and Kolo Road. All work is weather permitting.

 

Variable message boards have been posted. For weekly Kaua‘i lane closures go to, https://hidot.hawaii.gov/highways/roadwork/kauai/

 

 

 

###

 

Media contact:

HDOT Public Affairs Office

Phone: 808-587-2160

Email: [email protected]

Powered by EIN Presswire

Distribution channels:

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Submit your press release